Skip to content

Well House II

July 16, 2010
tags:

Rough carpentry finished this week, including the last of the roof decking and the beginnings of a door frame (yeah ok just an opening).

The structure is now disassembled and tucked neatly into the bed of my truck, including the Hardie board siding and metal roofing. Tomorrow is D-Day (Demotion day)

The weather tomorrow looks so-so, so I have to pull together enough pvc pipe to build a hoop-house frame to cover with a tarp and shelter the work area. ( so-so, so? :))

2 Comments leave one →
  1. Manuel Labor's avatar
    Manuel Labor permalink
    July 16, 2010 6:20 pm

    Hasta manana, jefe. Vamos estar a el cabin a las 11:00.

  2. Mr C.'s avatar
    Mr C. permalink
    July 19, 2010 2:36 pm

    Neither wind nor rain

    Nor severe back pain

    Could interfere with this work train

    Tho’ working goes against my grain

    And causes me to wheeze with strain

    I’d happily do it all again

Leave a reply to Mr C. Cancel reply